The first step in the process of connecting to the power grid

Begins with determining the responsible network organization for the selected land plot. It is recommended to use the website of the Moscow Department of Housing and Communal Services, where in the section "Determining the parameters of technological connection" you can select a site or enter the coordinates of an object under construction. Connection parameters such as reliability category (I-III), maximum power and voltage level (NN or CH) are also indicated here. If the necessary information is not available, you should contact the local government, which will provide the data within 15 days.

To apply for the connection, you must prepare the following documents:

  • The applicant's passport or the representative's power of attorney;
  • A plan with the location of the power receiving devices;
  • A single-line diagram of the power grid;
  • The list of connected equipment and equipment;
  • Documents confirming the rights to the land or object;
  • Draft power supply contract and other supporting documents.

After collecting all the documents, you should apply for technological connection through the Public Services Portal, customer service or by mail. As a result of consideration of the application, a draft contract and technical conditions will be issued, or a reasoned refusal in case it is impossible to meet the capacity requirements. An incomplete set of documents or errors in them can also lead to rejection. The final stage is the signing of a contract for technological connection and the conclusion of a contract for the supply of electricity with a sales company.

When organizing a connection to the power grid

When organizing a connection to the power grid, several important aspects must be taken into account. Technical specifications (technical specifications) for connection to power grids are key documents that determine the maximum capacity, connection deadlines and requirements for the power consumption of the facility. Unlike the technical specifications for other engineering networks, which can be integrated into the urban planning plan of the land plot and are not required before signing a construction contract, technical specifications for power supply are mandatory for concluding a contract for technological connection.

These documents must be obtained before the start of design work, as they are the basis for the development of the facility's power supply system. If the existing power grids are not able to provide the requested capacity, the grid company may refuse to issue the technical specifications. In this case, it may be necessary to build a new line from the power plant or install an autonomous generator set, which significantly increases the cost of the project. Timely registration of technical specifications for power supply and other necessary engineering networks helps to avoid delays and additional costs during construction.